VJCET realized the relevance of emission free energy sources for the sustainable development of our nation. Hence, Solar power plants are installed in VJCET in three stages. Effective participation of students and staff were ensured during the erection and commissioning of solar power plants. Total Capacity of Solar Power Plant in our campus is 280kWp and is directly connected to the utility grid of KSEB. Solar energy meets about 63% of our energy demand. Excess power generated by the solar power system during holidays is fed to the utility grid.
There are THREE grid connected solar power plants at VJCET
Total Capacity: 280 kWp
Stage | Capacity | Module Make | Inverter Make | Vendor | Year |
Phase 1 | 50 kWp | M/s Sungrace-India, 250 kWp | KACO-Germany, 1 No, 49.9 kW | M/s Alternate Energy Solution Angamaly/Sungrace Energy Solution Hyderabad | 2017 |
Phase 2 | 200 kWp | M/s APS, 350 kWp | ABB, 2 No, 100 kW | M/s Soura Natural Energy Solution India Pvt. Ltd Koratty, APF Ahamdabad | 2019 |
Phase 3 | 30 kWp | HHV, 320 kWp | FRONIUS Austria, 2 No, 15 kW | M/s KC Kopar-Angamaly | 2020 |
Solar Modules on D Block Top
Participation of Faculty and Students for Installation and Performance Analysis
Polycrystalline Modules of 200kWp Plant at D Block Top
A view of 50 kW Plant at C Block Top
Inverter Units of 200kWp Plant Connected to Grid